PREVIOUS
NEXT
5. The concrete floor is sealed with a           
decorative non porous coating, plaster,       
epoxy, fiberglass, your choice.
6. The concrete is placed around the top         
 perimeter of the pool forming the deck.
             Featuring
PHASE 2 CONSTRUCTION

Phase 2 is a  construction technique
that greatly simplifies pool
construction. It enables us to build the
pool in more controlled segments
which can cut cost, speed
construction , and eliminate errors. It
allows us to cope with labor and
material shortages as well as
inclement weather.
The pool is completed and ready
for years of family fun.